铅丝网笼的使用流程 |
添加时间:2018/1/22 17:20:35 浏览次数: |
把原材料从机械织网到人工裁剪再到人工全边,然后人工组装就成了一个石笼网箱,石笼网箱又叫铅丝网笼,下面我们来看看它的安装流程吧
The raw materials from mechanical weaving to artificial cut to total edge, and then assembled into a artificial stone cage nets, stone cage nets called wire mesh cage, let us look at the process to install it.
将石笼网错缝摆设就位,避免出现纵向贯通缝;
The stony cage network is placed in position to avoid longitudinal penetration.
将石笼网四边立起,用绑线将相邻边沿锁紧,绑锁时,将绑线围绕两条重合的框线(缝合边棱时) 或框线与网笼的双扭结边(缝合格栅时) 螺旋状扭紧,避免重镀锌损伤,螺距不大于50 mm ;
The stone cage nets four erected, with tie line adjacent edge locking, the lock box tied, tied to the line on the line for the coincidence of the two (suture edge when) or frame double kink line and cage edge (suture spiral grille) tighten, avoid heavy galvanized damage, the pitch is not greater than 50 mm;
当在已完成的底层网上面安装绿滨垫时,应用绑线沿新装雷诺护垫下部边框将其固定在底层的雷诺护垫上,同一层相邻的雷诺护垫也应用绑线相互系牢,使雷诺护垫连成一体;
When the green mat is installed on the underlying network, the binding line is fixed on the bottom Reynolds cushion along the lower part of the new Reynolds cushion. The same layer of the Reynolds cushion is also applied to tie up the tie line to fasten each other, so that the Reynolds pad is integrated into one.
在某单元工程的同一水平层施工时,应将绿滨垫全部就位后才开始填充卵石,为了防止石笼网变形,相邻两个绿滨垫(包括同一绿滨垫垫的相邻格室) 的填石高差不应大于35 cm ;
In the same level construction of a unit project, the green cushion should be placed in place before filling the pebble. In order to prevent the deformation of the cage net, the height difference between two adjacent green mat, including the adjacent green compartment mat, should not exceed 35 cm. |